Ft. Worth DHQ Parking Lot Modifications
CMC reconstructed and modified parking areas at the Texas Department of Transportation's Fort Worth District Headquarters. Work included demolition, storm utilities, grading, subgrade preparation, curb and gutter, concrete, asphalt paving, striping, signage, wheel stops, lighting modifications, electrical vault work, irrigation, and hydromulch. Through controlled sequencing and testing, CMC improved drainage, circulation, visibility, and long-term parking performance while maintaining access to an active public facility.